In morning , 28 , December ,2004 , celebrate a ceremony for signing an agreement about cooperation investment

in item of Jinxi Jinlan Cold Rolled Steel Sheets between China Oriental Group Company Limited and Foshan Jinlan Group , and celebrate a ceremony for hanging signboard .

In February , 2005 , Jinxi Jinlan Cold Rolled Steel Sheets Co.,Ltd finished to build factory buildings which construction
area reached 130,000 square meters in first term basely , and entered period of equipments installation, test to put into production .

In April ,2005 , first production line put into production formally .

In May , 2005, 1480 six roller reversible cold- rolled set put into production .

In June , 2005, first term engineering semi-continuous shallow trough stable flow acid pickling set put into production .

In May , 2006, continuous annealing hot-dip zinc-coated production line put into production , in the second term 
egineering first production line put into production .

In July , 2006 , 1-6 sets NH cover style annealing stove put into production .

In September , 2006 , two lines 900 distributing strips set in succession put into production .

In November , 2006 , 110KV substation put into operation .

In December ,2006, the second term engineering had entered winding up engineering , 8 sets 850 rolled machine 
whole put into production .

In March , 2007 , in the second term engineering wide belt zinc-coated production line begin to prepare to build.